The base insulation under a cryogenic tank carries the full hydrostatic load of the contents and must do so at cryogenic temperature, for the life of the tank, with no possibility of inspection or repair. It is the one insulation detail where the structural check matters as much as the thermal one.

Compressive strength at temperatureLayer build-up and load spreadingHeat leak through the baseSettlement and foundation heating
Cryogenic tank base insulation build-up and load-bearing detail
1,000,000+ m²Completed insulation application
15,000+ MWPower plant capacity insulated
20+ yearsEngineering and site experience
3 continentsProject delivery
Scope

Three checks that have to pass together

Base insulation is specified once and never revisited. All three checks are done before construction because none can be redone afterwards.

01

Compressive strength at service temperature

Rated strength is a room temperature figure in many catalogues. The check is against the strength at service temperature, with a creep allowance for a permanent load.

02

Layer build-up and load spreading

Multiple layers with staggered joints, load-spreading courses where required and a defined bearing arrangement at the shell, drawn rather than described.

03

Heat leak and foundation protection

Base heat leak into the boil-off balance, and whether foundation heating is required to keep the ground below from freezing and heaving.

No second chance

Everything under the tank floor is permanent. The design margin on base insulation is set deliberately higher than on any other part of the system, because the consequence of an error is not a repair but a tank.

Cryogenic tank base insulation layer build-up and load path
Method

How the build-up is established

We work from the tank loading, the service temperature and the boil-off allowance: the structural check sets the minimum grade and the layer arrangement, the thermal check sets the total thickness, and the governing one is adopted with its margin stated explicitly.

  • Hydrostatic and test load cases established with the tank designer
  • Compressive strength taken at service temperature with a creep allowance
  • Layer arrangement and joint staggering drawn, not left to the installer
  • Base heat leak calculated into the overall boil-off balance
  • Ground temperature checked and foundation heating assessed
Deliverables

What you receive for design and for construction

Issued in a form the tank designer and the civil contractor can both work from, because the detail sits between the two.

Structural check report

Load cases, strength at temperature, creep allowance and the resulting margin.

Thermal calculation

Base heat leak and its contribution to the boil-off balance.

Build-up detail drawings

Layers, joint staggering, bearing arrangement at the shell and at penetrations.

Material specification

Grade, density and rated properties with the temperature basis of each figure.

Installation sequence

Laying sequence and tolerances, with the inspection points before load is applied.

Interface note

What the tank designer and the civil contractor each need to confirm.

Interface coordination between tank, foundation and base insulation design
Interfaces

The detail lives between three disciplines

The tank designer owns the loads, the civil contractor owns the foundation and the insulation designer owns the layer that sits between them. Errors here are almost never calculation errors; they are assumptions one discipline made about what another had already confirmed.

  • Load cases confirmed in writing with the tank designer, not inferred
  • Foundation levelness tolerance agreed before the first layer is laid
  • Heating element arrangement coordinated with the base insulation layout
  • Penetration and shell bearing details agreed with all three parties
  • Inspection before cover agreed as a hold point, because there is no later access

Industrial Insulation Catalogue

Engineering scope, calculation and documentation services, material families and application capability in a single document.

Open the 2026 catalogue

Working worldwide

ERATHERM works as an engineering partner for operators, EPC contractors and equipment manufacturers. Calculation, design, documentation and specification work is delivered remotely under the client's document control procedure; inspection, site supervision and application teams are mobilised to site.

  • Europe, the Middle East, Asia, Africa and the Americas
  • EPC-level deliverable documentation
  • Client document control procedure
  • Remote engineering and site mobilisation
Questions

Tank base insulation questions we are asked

Why is compressive strength at temperature different from the catalogue figure?

Most published strengths are measured at room temperature. Some materials gain strength at cryogenic temperature and some lose it, and a permanent load also brings creep into the picture. The design has to use the property at the condition that actually applies.

Is foundation heating always required?

No, and whether it is depends on the base heat leak, the ground conditions and the foundation type. An elevated foundation with a ventilated void may not need it; a slab on frost-susceptible ground usually will. The check is part of the base design.

Can base insulation be inspected or replaced later?

No. That is the single fact that shapes the whole design. It is why the margin is larger, why inspection before cover is a hold point, and why the material selection leans toward proven performance over optimisation.

Who should own this detail on a project?

In practice it needs a single owner coordinating the tank designer, the civil contractor and the insulation supplier. Where no one holds that role, the gaps between the three scopes are where the problems come from, and that coordination is what we are usually asked to provide.

Send the tank loading and the boil-off allowance

We will run the structural and thermal checks together and return a base detail the tank designer and the civil contractor can both build to.