Eratherm İzolasyon A.Ş.
Joint sealing · Contraction · Vapour stops

Cellular Glass Insulation Detail Design for cold and cryogenic service

Cellular glass is chosen because it is closed-cell, load-bearing and does not absorb water. None of that survives bad detailing. The material is rigid and brittle, the substrate contracts underneath it, and every joint is a potential vapour path — so the detail drawings, not the material certificate, decide whether the system works.

Joint sealing and staggeringContraction joint placementLoad-bearing supportsVapour stop detailing
Cellular glass insulation detail design on cold service piping
1,000,000+ m²Completed insulation application
15,000+ MWPower plant capacity insulated
20+ yearsEngineering and site experience
3 continentsProject delivery
Scope

Four details that govern the system

Cellular glass fails at the joints and at the supports, not in the block. These are the details that have to be drawn before anything is ordered.

01

Joint sealing and staggering

Every joint sealed with the specified compound and staggered between layers, because an aligned joint through the full thickness is a direct path from ambient to the cold face.

02

Contraction joints

The pipe shrinks as it cools and the insulation does not follow it. Contraction joints are located and sized so the movement is absorbed where it is designed to be, not by cracking a block.

03

Load-bearing supports

Cellular glass carries load, which is why it is used at supports. The bearing area, compressive stress and load spreading are calculated rather than assumed.

04

Vapour stops

Full-thickness vapour stops at intervals and at every termination, so a local barrier failure cannot wet the whole run.

Thermal shock

Rapid cooldown puts the hot face and cold face of a block at very different temperatures. Block size, joint width and sealant selection all follow from the cooldown rate, which is why we ask for it before detailing anything.

Cellular glass joint, contraction and vapour stop detail drawings
Method

How the details are developed

We start from the service temperature, the cooldown rate and the support arrangement, calculate the contraction over each run and the bearing stress at each support, and then draw the joints, vapour stops and supports as buildable details with dimensions rather than as notes on a specification.

  • Contraction over each run calculated from the real temperature range
  • Contraction joint spacing and width derived, not taken from a default table
  • Bearing stress at each support checked against the block's rated strength
  • Vapour stop interval set and drawn, with the termination detail at each end
  • Sealant selected for the service temperature and for the joint movement
Deliverables

What you receive for fabrication and site

Drawn at the level an installer can build from, because this is a system where interpretation on site is the main failure mode.

Detail drawing set

Joints, contraction joints, vapour stops, supports and terminations, dimensioned.

Contraction calculation

Movement by run, joint spacing and width, with the temperature basis stated.

Support load check

Bearing area and compressive stress at each support against the rated strength.

Material and sealant schedule

Block grade, sealant, mastic and finish by service, with temperature limits.

Bill of materials

Quantities by detail type, suitable for enquiry and for procurement.

Installation notes

The sequence and workmanship points this system is least tolerant of.

Comparison of cellular glass against alternative cold service insulation
Comparison

Cellular glass is not always the right answer

It is the right answer where load-bearing capacity, closed-cell structure and fire behaviour all matter at once. It is the wrong answer where the geometry is complex, the budget is tight or the installer has no experience with it, because its advantages depend entirely on workmanship that other materials forgive.

  • Load-bearing requirement — where it is genuinely the differentiator
  • Complex geometry — fabrication cost rises sharply with the number of shapes
  • Installed cost compared against PIR, aerogel and composite build-ups
  • Installer capability assessed honestly before the material is specified
  • Where another material is better, we say so before the order is placed

Industrial Insulation Catalogue

Engineering scope, calculation and documentation services, material families and application capability in a single document.

Open the 2026 catalogue

Working worldwide

ERATHERM works as an engineering partner for operators, EPC contractors and equipment manufacturers. Calculation, design, documentation and specification work is delivered remotely under the client's document control procedure; inspection, site supervision and application teams are mobilised to site.

  • Europe, the Middle East, Asia, Africa and the Americas
  • EPC-level deliverable documentation
  • Client document control procedure
  • Remote engineering and site mobilisation
Questions

Cellular glass questions we are asked

Does cellular glass still need a vapour barrier?

Yes. The block itself is closed-cell and will not absorb water, but the joints between blocks are not. A continuous vapour barrier and full-thickness vapour stops are what stop moisture travelling along the joint network to the cold face.

How is contraction joint spacing decided?

From the contraction of the substrate over the run, which follows from the temperature range and the pipe material. A default spacing taken from a catalogue will be wrong at both ends of the temperature range, and cracked blocks are the usual evidence.

Why is it used at pipe supports specifically?

Because it carries compressive load without creeping, so the pipe shoe can bear directly on insulation instead of on a steel bridge through it. That removes one of the largest heat leak paths in a cold system.

What is the biggest installation risk?

Unsealed or aligned joints. The material tolerates very little improvisation, and a run installed quickly by a crew used to flexible insulation will usually have both problems. This is why we detail it fully and why inspection before cladding matters.

Send the line list and the cooldown rate

We will calculate the contraction, check the supports and return detail drawings an installer can build from without interpretation.