Heat loss, two cases
Loss from the surface as it is today and as it would be after the change, at the same operating temperature and ambient. The difference is the only thing that counts.
The chain from an insulation thickness to a tonne of avoided CO2 is short and it is auditable: heat loss difference, operating hours, boiler or heater efficiency, fuel energy content, emission factor. Every step is a number someone can check, and every step is where an exaggerated claim usually hides.

Each step has an input you own and an assumption we have to declare. Nothing in this calculation should be a number you cannot trace.
Loss from the surface as it is today and as it would be after the change, at the same operating temperature and ambient. The difference is the only thing that counts.
Loss multiplied by real operating hours, not calendar hours. Seasonal and intermittent services are handled with an operating profile rather than a single factor.
Heat delivered divided by generation efficiency gives fuel consumed. Efficiency comes from your plant data where it exists and is stated as an assumption where it does not.
Fuel converted to CO2 using a published factor, cited by source and year, with the scope boundary stated so the figure can be used in reporting.
The commonest overstatement is applying an ideal thickness improvement across a whole plant when only part of it is actually defective. We calculate from a surveyed condition, not from a nominal one.

Heat loss for both cases is solved to the same standard used for thickness design, so the energy figure and the design figure cannot disagree. The result is reported as a range with the dominant uncertainty named, rather than as a single confident number.
Written so it survives review by a finance team and by a sustainability auditor, who will ask different questions of the same numbers.
The full chain from surface condition to tonnes CO2 per year, step by step.
Annual energy saved, fuel saved and cost saved at a stated fuel price.
Tonnes CO2 per year avoided, with factor source and reporting scope stated.
Simple payback and cost per tonne abated, against the installed cost of the work.
Where the saving per unit of spend is highest, so the budget goes to the right lines.
Every efficiency, price, hour count and factor used, with its source and date.

An emission claim built on a nominal insulation condition is a guess. The defensible version starts from a survey: which lines are bare, which are wet, which are intact and what each is actually running at. That survey is usually the smaller part of the cost and the whole of the credibility.
Industrial Insulation Catalogue
Engineering scope, calculation and documentation services, material families and application capability in a single document.
ERATHERM works as an engineering partner for operators, EPC contractors and equipment manufacturers. Calculation, design, documentation and specification work is delivered remotely under the client's document control procedure; inspection, site supervision and application teams are mobilised to site.
The calculation is built to be auditable and the emission factor is cited with its scope boundary, which is what a reporting framework requires. Whether it qualifies under your specific scheme depends on that scheme's rules on measurement and verification, and we state the basis clearly so your reporting team can make that judgement.
Because operating hours and generation efficiency are rarely known precisely, and a single number hides that. A range with the dominant uncertainty named is more useful to a decision than a precise figure that cannot be defended.
It varies too widely for a useful average — bare hot lines pay back very fast, intact systems being upgraded for marginal gain may never pay back. That is exactly why the survey and the ranking matter more than a headline figure.
We can include it where the manufacturer publishes an environmental product declaration. For most hot service applications the operational saving dominates embodied carbon within the first year, but the comparison should be shown rather than assumed.
The emission case rests on the same heat loss work as the thickness design.
Calculation and design
Insulation thickness calculation Condensation control calculation Freeze protection thickness Fire-rated insulation thickness Acoustic insulation thickness CO2 emission reduction calculationWe will build the chain from surface condition to tonnes of CO2, state every assumption and rank where the budget delivers the most abatement.